Herzlich willkommen bei SPECIAL-LED - jetzt professionell auf LED umsteigen

LED starter bridge

Why is an LED starter bridge needed?

If conventional fluorescent tubes are replaced by LED fluorescent lamps, then an LED starter bridge may be necessary.

An LED starter bridge is needed when the KVG / VVG remains in operation inside the lamp.

The exchange with KVG / VVG is carried out in the following order:

1. remove old tube
2. remove old starter
3. Install the LED starter bridge
4. Install the LED tube

 

The replacement of the LED fluorescent lamp with ECG is carried out in the following order:

1. remove old tube
2. Have ECGs bridged by qualified personnel in accordance with the ECG circuit diagram
3. Install the LED tube

 Glossar LED-Starterbrücke